We pride ourselves at Davey Tree on providing prompt, professional and personalized service from certified arborists that live, work and engage in your community. Contact one of our Davey Tree specialists for your residential, commercial, utility, or environmental needs.
Electric Investor-Owned Utility
Davey Resource Group, Inc.’s auditing services provided the necessary recommendations for Pacific Gas and Electric for improved irrigation systems and new vegetation.
Residential/Mixed Use
DRG converted concrete basins into stormwater ponds with lush native plantings for the Landings at the Glen subdivision in Glencoe, Illinois.
Municipality
DRG transformed a barren stormwater basin into a thriving ecosystem and trail system at Culver Park in Homer Glen, Illinois.
Municipality
DRG planted and performed aftercare services on 611 trees in Quincy, MA as part of the Greening the Gateway Program. Thanks to the expertise of DRG’s crews, the tree mortality rate was under 5%.
Electric Investor-Owned Utility
DRG’s remote sensing team processed LiDAR data to flag encroaching vegetation on BGE’s transmission lines, allowing the utility to quickly identify and remove potential hazards and avoid regulation violations.
Non-Profit
The Cuyahoga County Public Library has 27 branches, each with unique landscaping and grounds management needs. Davey’s multi-division collaboration makes sure each branch’s needs are met.
Mitigation Banking
DRG provided invasive species management and control for the 230-acre Lake Station Mitigation Bank, bringing the area back into compliance with state and federal regulations.
Natural Gas/Pipeline
Davey Resource Group has been the go-to partner for environmental policy compliance with over 500 projects in Ohio since 2010.
Electric Investor-Owned Utility
DRG’s system inventory provides a Michigan utility with the most recent information on their distribution system, allowing the utility to make informed decisions that can decrease outage duration and frequency.
Transportation
Davey Resource Group coordinated the preparation of an Environmental Assessment in accordance with federal regulations for the replacement of a critical connector bridge that was originally constructed in 1930.
No Results