Electric Investor-Owned Utility
When a Northeast U.S. utility was met with pushback during a capital improvement project, Davey Resource Group, Inc. was called in to find a compromise.
Electric Investor-Owned Utility
Customer ticket program improvements leads to nearly 20% savings.
Electric Co-op Utility
Davey Resource Group collected location data on over 11 million feet of lines for TVEC, which will be used to design a route for fiber line installation.
Electric Investor-Owned Utility
Implementing a Tree Growth Regulator program saves San Diego Gas & Electric time and money, while boosting customer service.
Electric Investor-Owned Utility
DRG helped develop an efficient solution to inspect a Northeast U.S. utility’s underground cabinets.
Electric Co-op Utility
Davey Resource Group, Inc. conducted two separate inspections to help a local utility receive federal funding assistance after the damage from Hurricane Sally caused major outages across their service area.
Municipality
DRG provided waterline extension and replacement services, such as surveys, rights-of-way definition, engineering analysis, design, traffic plans, grant applications, utility coordination, permitting, and construction administration for the Village of Minerva, OH.
Electric Co-op Utility
Using sound and visual inspection methods, DRG assessed utility poles to help Southeastern Electric Cooperative prioritize pole replacements throughout their system
Electric Investor-Owned Utility
DRG assists SDG&E with its Sustainable Tree Program, a tree planting program that helps the utility reach its goal of planting 10,000 trees annually.
Electric Investor-Owned Utility
DRG leverages drone-captured LiDAR data and 3D PLS CADD maps to pinpoint potential hazard trees during construction of Dominion’s new overhead electric transmission, cutting down on unpredictable costs and potential schedule delays.