We pride ourselves at Davey Tree on providing prompt, professional and personalized service from certified arborists that live, work and engage in your community. Contact one of our Davey Tree specialists for your residential, commercial, utility, or environmental needs.
Electric Co-op Utility
Davey Resource Group collected location data on over 11 million feet of lines for TVEC, which will be used to design a route for fiber line installation.
Electric Co-op Utility
DRG performed a full-system inventory for PIEG to jumpstart the utility’s fiber to the home project.
Electric Investor-Owned Utility
After high winds and heavy rain from Hurricane Isaias caused severe damage to several areas along the East Coast, Davey assembled a team to clear debris and make way for line repair crews to restore power.
Natural Gas/Pipeline
Just-in-time Environmental Permitting Keeps Large Pipeline Project on Track.
Hospitality
Davey provides grounds management to hotels in all serviceable areas through the Avendra relationship. As a preferred and vetted service provider, Davey’s high-quality work helps boost curb appeal for Avendra’s clients.
Medical
Davey works to meet and exceed the Cleveland Clinic’s expectations of safety without sacrificing curb appeal through consistent year-round grounds maintenance at the downtown Cleveland Clinic campus.
Energy
The Somerville Landfill is being redeveloped as a solar array field. DRG conducted wetland and state open water delineation, provided regulatory permitting services, and ensured no solar panels are placed in wetlands. DRG also prepared and submitted multiple NJDEP permit applications.
Residential/Mixed Use
Pulte Homes hired Davey Resource Group Engineering to perform site planning, civil engineering, and surveying services to prepare residential lots for development in the Arbor Chase subdivision.
Government
Davey Resource Group removed invasive species in the southwest Michigan state game lands, providing a healthy ecosystem for endangered animal species.
Cemetery
WSSI was part of the Arlington National Cemetery Millennium Project team. As part of the project, they designed and permitted the stream restoration component that was an integral part and focal point of the aesthetic layout of the expansion.
No Results