We pride ourselves at Davey Tree on providing prompt, professional and personalized service from certified arborists that live, work and engage in your community. Contact one of our Davey Tree specialists for your residential, commercial, utility, or environmental needs.
Electric Investor-Owned Utility
Since 2007, WSSI has been a trusted partner of an Eastern U.S. based utility for environmental compliance solutions.
Municipality
Severe erosion of 125 feet of streambank in Bath Township, OH was threatening an adjacent stormwater management basin. DRG used bioengineering methods to stabilize the streambank and provide in-stream habitat while preventing future erosion.
Other
DRG conducted stormwater infrastructure inspection and maintenance at Fast Park & Relax in Hebron, KY, focusing on a dry detention basin and a front swale. The team provided routine quarterly inspections, additional rainfall event inspections, and preventative maintenance.
Residential/Mixed Use
Pulte Homes hired Davey Resource Group Engineering to perform site planning, civil engineering, and surveying services to prepare residential lots for development in the Arbor Chase subdivision.
Municipality
Davey Resource Group mixed aesthetics and function by installing a specialized tree trench system to address stormwater management and encourage public use of the space at the entrance to Maplewood Community Center.
Municipality
DRG transformed a barren stormwater basin into a thriving ecosystem and trail system at Culver Park in Homer Glen, Illinois.
Mitigation Banking
DRG provided invasive species management and control for the 230-acre Lake Station Mitigation Bank, bringing the area back into compliance with state and federal regulations.
Residential/Mixed Use
DRG helped Holloway Ponds HOA install an environmentally-sustainable alternative to traditional landscaping through a series of rain gardens. DRG’s design plan was developed to eliminate turf, reduce stormwater runoff from the adjacent road, and support a variety of pollinator species.
Municipality
Davey Resource Group went above and beyond expectations while helming a 5-year contract with the Greater Cincinnati Metropolitan Sewer District to maintain two green infrastructure stormwater control measures in the city.
Hospitality
Davey Resource Group used gray and green infrastructures to solve stormwater issues at the Graduate Conference Center in Ohio.
No Results